US$ 995.00
Pay in 4 interest-free payments of $11.99 Learn more
direction-dependent triple headlights or red tail lights
different locations for the NRN pods and very soon after entry into service an additional yaw damper for greater stability at higher speed
54 cm x 60
Parallel Track Tools
WHEEL CONFIGURATION 4-6-2
34-437A LNER Thompson Brake Composite Corridor BR Maroon No. E1193E Brand_SPD-UK direction-dependent triple headlights or redAs part of our Winter 2022 British Railway Announcements, we are pleased to present this LNER Thompson Brake Composite Corridor Coach, No. E1193E in BR Maroon livery. Entering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen
US$ 995.00
US$ 275.00
US$ 187.00
US$ 120.00
US$ 59.00
US$ 192.50
US$ 995.00
US$ 78.00
US$ 65.00
US$ 4450.00