US$ 115.00
Pay in 4 interest-free payments of $9.74 Learn more
November 1943
ESU has been working with us since the start of the project
Plywood body construction came about as a result of a shortage of wooden planks at the end of the last war
R-0012 RAIL CENTER Signal Yellow
PROTOTYPE SPECIFIC INFORMATIONIn 1984
374-562B GWR Hawksworth Composite Corridor BR Maroon W7818W Brand_Digital-Plus-by-Lenz November 1943Frederick W. Hawksworth was the last Chief Mechanical Engineer of the Great Western Railway (GWR), succeeding Charles Collett in 1941, and his coach designs were the final evolution of passenger stock built by the GWR, being designed at the end of World War Two and entering traffic from 1947 onwards. With the Nationalisation of Britains railways in 1948, construction continued under BR and the final examples were outshopped during the 1950s. Intended
US$ 115.00
US$ 90.00
US$ 170.00
US$ 130.00
US$ 59.99
US$ 16.90
US$ 45.00
US$ 287.50
US$ 275.00