US$ 1074.50
Pay in 4 interest-free payments of $12.88 Learn more
flex track and any track brand
where coal drop staithes were commonly provided in the station goods yard
4 x 4 Aspect Sensor Signals (TTSS5)
3 x ST-11 Double Straights
and the welded hull and cast turret have been accurately reproduced
4P-020-112 GWR Toplight Mainline City Lined Chocolate & Cream All Third 3904 Set 2 Decoders flex track and any trackThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 1074.50
US$ 69.95
US$ 69.95
US$ 69.95