BVV Recovery Pump Top Dead Center Piston Calibration Plate Wiped Film EXPECT 3-WEEK LEADTIME
Description
EXPECT 3-WEEK LEADTIME
Branch Tee
A dry ice coil was used in between the output port of the pump and the recovery cylinder to condense vapor
Wear appropriate PPE
Specifications Material 304L Stainless Steel Certification: ABILITY ENGINEERING TECHNOLOGY INC
BVV Recovery Pump Top Dead Center Piston Calibration Plate Wiped Film EXPECT 3-WEEK LEADTIMEBVV Butane Recovery Pumps Top Dead Center Calibration Plate & Bolts Use with the Top Dead Center Clearance (TDCC) instructions Use this plate and a depth gauge to measure the Top Dead Center Clearance of the piston cylinder head assembly. Shims that come with the piston cylinders are stacked to create an area of displacement between the top of the cylinder and the compressor head. BVV's Recommended depth is 0. 012" for the BVV 4 & 2 Cylinder Butane
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
























